This manual presents fundamental principles underlying the design and construction of earth and rock-fill dams. The general principles presented herein are also applicable to the design and construction of earth levees.

E-Book Content

CECW-EG Department of the Army EM 1110-2-2300 U.S. Army Corps of Engineers Engineer Manual 1110-2-2300 Washington, DC 20314-1000 Engineering and Design EARTH AND ROCK-FILL DAMS GENERAL DESIGN AND CONSTRUCTION CONSIDERATIONS Distribution Restriction Statement Approved for public release; distribution is unlimited. 31 July 1994 EM 1110-2-2300 31 July 1994 US Army Corps of Engineers ENGINEERING AND DESIGN Earth and Rock-Fill DamsGeneral Design and Construction Considerations ENGINEER MANUAL DEPARTMENT OF THE ARMY U.S. Army Corps of Engineers Washington, DC 20314-1000 CECW-EG EM 1110-2-2300 Manual No. 1110-2-2300 31 July 1994 Engineering and Design EARTH AND ROCK-FILL DAMS—GENERAL DESIGN AND CONSTRUCTION CONSIDERATIONS 1. Purpose. This manual presents fundamental principles underlying the design and construction of earth and rock-fill dams. The general principles presented herein are also applicable to the design and construction of earth levees. The construction of earth dams by hydraulic means was curtailed in the 1940’s due to economic considerations and liquefaction concerns during earthquake loading and are not discussed herein. 2. Applicability. This manual applies to HQUSACE elements, major subordinate commands, districts, laboratories, and field operating activities having responsibility for the design and construction of earth and rock-fill dams. FOR THE COMMANDER: WILLIAM D. BROWN Colonel, Corps of Engineers Chief of Staff ___________________________________________________ This manual supersedes EM 1110-2-2300, dated 10 May 1982. DEPARTMENT OF THE ARMY U.S. Army Corps of Engineers Washington, DC 20314-1000 CECW-EG EM 1110-2-2300 Manual No. 1110-2-2300 31 July 1994 Engineering and Design EARTH AND ROCK-FILL DAMS—GENERAL DESIGN AND CONSTRUCTION CONSIDERATIONS Table of Contents Subject Chapter 1 Introduction Purpose . . . . . . . . . Applicability . . . . . . References . . . . . . . Overview of Manual Paragraph . . . . . . . . . . . . . . . . . . . . . . . . . . . . Chapter 2 General Considerations General . . . . . . . . . . . . . . . . . Civil Works Project Process . . Types of Embankment Dams . . Basic Requirements . . . . . . . . Selection of Embankment Type Environmental Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1 1-1 1-1 1-1 2-1 2-1 2-2 2-5 2-5 2-6 Chapter 3 Field Investigations and Laboratory Testing Geological and Subsurface Explorations and Field Tests . . . . . . . . . . . . . . . . 3-1 Laboratory Testing . . . . . . . . . . . . . . . 3-2 3-1 3-3 . . . . . . . . . . . . 1-1 1-2 1-3 1-4 2-1 2-2 2-3 2-4 2-5 2-6 Chapter 4 General Design Considerations Freeboard . . . . . . . . . . . . . . . . . . . Top Width . . . . . . . . . . . . . . . . . . Alignment . . . . . . . . . . . . . . . . . . . Embankment . . . . . . . . . . . . . . . . . Abutments . . . . . . . . . . . . . . . . . . Earthquake Effects . . . . . . . . . . . . . Coordination Between Design and Construction . . . . . . . . . . . . . . . . Value Engineering Proposals . . . . . . . . . . . . . . . . Page . . . . . . 4-1 4-2 4-3 4-4 4-
You might also like


Radiogenic Isotope Geology
Authors: Alan P. Dickin    313    0


Compressed Earth Blocks. Manual Of Design And Construction
Authors: Guillaud H. , Joffroy T. , Odul P.    131    0


Mathematical Methods For Engineers And Geoscientists
Authors: Olga Waelder    335    0


Encyclopedia Of Soils In The Environment
Authors: Daniel Hillel    123    0


Hydrogeophysics (2005)(en)(540s)
Authors: Yorum Rubin , Susan S. Hubbard    134    0



Tsunami. The Underrated Hazard
Authors: Edward Bryant    129    0


драгоценные камни
Authors: Смит Г.    253    0